Texas Municipalities Now Have a Clear Path to Resilience

What the Newly Approved Texas Backup Power Package Means for Local Governments 

When the Public Utility Commission of Texas (PUCT) officially approved the Texas Backup Power Package (TBPP) rules on May 7, the state created a long‑awaited pathway for municipalities to improve the resilience of their critical facilities through low‑cost or forgivable loans that support the installation of multiday, grid‑independent backup power systems.

 

The TBPP program provides $1.8 billion in grants and low-cost or forgivable loans to help local governments install multiday, grid-independent backup power systems. This milestone gives Texas communities a powerful new tool to keep essential services operating during extended grid outages.  

 

Texas cities face rising demands on their infrastructure. Extreme weather events, population growth, and grid constraints continue to affect critical operations. Many cities experience outage durations lasting hundreds of minutes each year, impacting hospitals, water treatment plants, first-response facilities, and shelters. The newly approved TBPP rules directly address these risks by enabling communities to design and deploy advanced, resilient power systems. 

Aerial view of Galveston Beach, Texas, USA

The TBPP program funds systems capable of operating for 48 hours or more without relying on the electric grid. To meet program requirements, each system must include:

  • Natural gas or propane generator
  • Solar photovoltaic (PV) panels
  • A microgrid controller that coordinates generation, storage, and load

These components work together to form a microgrid that can power a facility independently when the electric grid fails. The program supports facilities with peak loads up to 2.5 megawatts (MW). 

This integrated approach helps cities maintain operations at their most essential locations during emergencies. 

 

Texas cities face rising demands on their infrastructure. Extreme weather events, population growth, and grid constraints continue to affect critical operations. Many cities experience outage durations lasting hundreds of minutes each year, impacting hospitals, water treatment plants, first-response facilities, and shelters. The newly approved TBPP rules directly address these risks by enabling communities to design and deploy advanced, resilient power systems. 

Why TBPP Matters for Texas Municipalities 

Texas has more than 31,000 critical facilities, which include: 

water

Water and wastewater treatment plants

EMS

Police stations, fire stations, Emergency Medical Services (EMS), and 911 centers  

3

Hospitals, clinics, senior care centers, and dialysis centers  

Community

Community hubs such as schools, libraries, town halls, and resilience shelters  

5

Fuel stations and grocery locations in low-access areas  

These sites serve residents when stability matters most. A prolonged outage at any one of them can ripple across an entire community. The TBPP program helps municipalities modernize their backup power capabilities and reduce vulnerability to blackouts. 

How House Bill 7 Strengthens TBPP Objectives 

 

House Bill 7 (HB 7) focuses on improving grid reliability and ensuring critical infrastructure, including water systems, remains functional during emergencies. HB 7 reinforces the importance of local resilience planning and aligns directly with the design intent of TBPP. 

 

Together, TBPP and HB 7 establish a strong regulatory foundation requiring more robust resilience standards and a funding mechanism that empowers municipalities to upgrade their systems. 

This creates a powerful incentive for cities, counties, and districts to act now. 

What Funding Is Available Under TBPP 

 

Municipalities can access: 

  • Grants up to $500 per kilowatt (kW)  
  • Low-cost or forgivable loans to support procurement, construction, and long-term operation  
  • Funding for engineering, installation, and all required system components  

 

This combination helps municipalities with limited capital budgets develop high-resilience solutions that previously felt out of reach. 

We act as a trusted advisor, not just an engineering or construction firm. Our mission is to help municipalities build resilience with clarity, confidence, and long-term value.

 

With the TBPP rules now approved, Texas municipalities have a historic opportunity to protect their communities from extended outages. By preparing early and taking advantage of state funding, local governments can build modern, reliable energy systems that safeguard essential services for decades to come.Â