UNIVERSITY OF ARKANSAS
RAZORS EDGE
Razors EDGE - University of Arkansas
Building Improvements
Health, Physical Education
and Recreation (HPER)
Pool Solar Panels
Energy and Operational Savings Over $5.2 Million Annually
Campus Wide
• Upgrades to the lighting system
• Water system upgrades
• Building automation upgrades
• Upgrades to existing HVAC equipment
• Installation of new HVAC equipment
Athletic Buildings
• Upgrade from incandescent to fluorescent lighting
• Installation of low flow valves on sinks, toilets, and shower heads
• Replacement of existing steam traps
• Repair to the existing sewage ejector line at Baum Stadium
E&G Buildings
• Upgrade from incandescent to fluorescent lighting
• Installation of low flow valves on sinks, toilets, and shower heads
• Replacement of existing steam traps
• Installation of new dedicated outdoor air systems for energy control ventilation
• Installation of Aegis grounding rings on motors to prevent bearing failures
• Solar Panel array used to assist in the heating of the pool at the HPER
Housing Buildings
• Upgrade from incandescent to fluorescent lighting
• Installation of low flow valves on sinks, toilets, and shower heads
• Replacement of existing steam traps
• Variable speed pumping and pump insulation
• Installation of new dedicated outdoor air systems for energy control ventilation
• New variable speed kitchen exhaust system
Arkansas Union
• Upgrade from incandescent to fluorescent lighting
• Installation of low flow valves on sinks, toilets, and shower heads
• Replacement of existing steam traps
• New dedicated outdoor air system for the catering kitchen
©2014 by Razors EDGE, University of Arkansas & Energy Systems Group. All rights reserved.