Improving Comfort and Efficiency District-Wide

INDIANAPOLIS, INDIANA

Perry Township Schools recognized the need to address aging infrastructure, growing student enrollment, and the demand for modern, energy-efficient learning environments to continue supporting high-quality education across the district.

32,606,625

Worth of upgrades

48,050,287

total savings

16,680,031

in energy and operational savings

2,465,000

square feet revitalized

Innovative Solutions

Facility upgrades have paved the way for sustainable operations, reduced maintenance burdens, and improved reliability across nearly 2.5 million square feet of learning and community space.

Facility Upgrades:

Upgraded LED lighting district-wide, including new fixtures and retrofits, enhanced by occupancy sensors to reduce energy consumption, resulting in brighter, safer learning environments with improved visibility and significant long-term cost savings.

Air conditioning and dehumidification systems in four gymnasiums were fully replaced with advanced HVAC solutions, significantly enhancing climate control to provide consistent year-round comfort, improve indoor air quality, and support a wide range of student and community activities with greater energy efficiency.

Replaced aging equipment with high-efficiency condensing boilers and low-noise chillers to deliver consistent temperature control, reduce energy consumption, minimize maintenance needs, and create a quieter, more focused learning environment that supports student well-being.

Enhanced air filtration and upgraded insulation across 26 facilities created healthier, more comfortable environments that support student health and maintain consistent indoor temperatures for better learning and working conditions.

Replaced HVAC systems and upgraded controls at Perry Meridian High School to increase operational efficiency, reduce noise disruptions, and improve overall comfort for students, staff, and neighboring residents.

Comprehensive renovations, including roof replacements and the installation of high-efficiency electrical transformers improved building durability, enhanced system reliability, lowered energy consumption, and reduced maintenance costs district-wide.

SchoolSafety_Solutions-White-13

ENHANCED LEARNING ENVIRONMENT

Perry Township Schools upgraded key infrastructure to create safer, more comfortable, and healthier spaces that improve student focus and support academic success.

CostSavings_Services-White-11

SIGNIFICANT Energy & COST SAVINGS

The district achieved over $16.6 million in energy and operational savings, helping reduce expenses and fund future educational priorities.

PerformanceContracting_Services-White-09-09

COMPREHENSIVE PROJECT MANAGEMENT

ESG managed the modernization process, including ongoing performance tracking, ensuring long-lasting, sustainable improvements across 26 facilities in the district.